Vitriturf, leader in poured in place safety surfacing recently supplied its TK System to a school in Jonesboro, Arkansas. TK is the only system of its kind in poured in place safety surfacing. The system creates stabilization for Vitriturf to be installed over any hard, sound and flat sub base. In Jonesboro, the client didn’t have the funds to excavate the existing surface and install compacted stone aggregate. The Vitriturf TK System was chosen and the client estimated a savings of over $15,000. The TK System utilizes a welded wire mesh installed directly over the existing sub base and then the Vitriturf System installed directly over the mesh. This can be accomplished because Vitriturf changed its PH value in their binder so it would not react with the wire mesh. The TK System has been utilized for over 15 years with tremendous success. The 4800 square feet in Jonesboro can now be added to their list of completed projects.